AGARD Working Group 21 data base - October 1997 CASE PCH02 Smooth Wall Pipe Reynolds Stresses Re =125,000 (nominal) Ut =0.7755 m/s x/D =398.5 D =99.1 mm nominal wire length =0.8 mm hot-wire results corrected for density decrease at the measuring station owing to the pipe pressure drop. data in following order y(mm), y/(D/2), u'2/Ut2, v'2/Ut2, -u'v'/Ut2, 49.55 1.0000 0.8303 0.4449 0.0508 45.00 0.9082 0.9381 0.4695 0.1423 40.00 0.8073 1.201 0.5139 0.2439 35.00 0.7064 1.552 0.5864 0.3489 30.00 0.6054 1.963 0.6530 0.4536 25.00 0.5045 2.375 0.7326 0.5517 20.00 0.4036 2.892 0.8269 0.6645 15.00 0.3027 3.414 0.8822 0.7484 12.00 0.2422 3.762 0.9155 0.7953 10.00 0.2018 3.968 0.9523 0.8291 7.00 0.1413 4.314 0.9619 0.8820 6.00 0.1211 4.374 0.9539 0.8769 5.00 0.1009 4.488 0.9697 0.8873 4.50 0.0908 4.474 0.9663 0.8737 4.00 0.0807 4.572 0.9771 0.9091 3.50 0.0706 4.558 0.9520 0.8724 3.00 0.0605 4.651 0.9707 0.8891