AGARD Working Group 21 data base - October 1997 CASE PCH02 Smooth Wall Pipe Reynolds Stresses Re =150,000 (nominal) Ut =0.9178 m/s x/D =398.5 D =99.1 mm nominal wire length =0.8 mm hot-wire results corrected for density decrease at the measuring station owing to the pipe pressure drop. data in following order y(mm), y/(D/2), u'2/Ut2, v'2/Ut2, -u'v'/Ut2, 49.55 1.0000 0.8741 0.4598 0.0531 45.00 0.9082 0.9569 0.4839 0.1422 40.00 0.8073 1.197 0.5327 0.2524 35.00 0.7064 1.555 0.6119 0.3699 30.00 0.6054 1.962 0.7059 0.4868 25.00 0.5045 2.439 0.7924 0.6015 20.00 0.4036 2.953 0.8766 0.7010 15.00 0.3027 3.551 0.9630 0.8301 12.00 0.2422 3.982 0.9824 0.8818 10.00 0.2018 4.360 1.012 0.9492 7.00 0.1413 4.681 1.043 0.9831 6.00 0.1211 4.695 1.041 1.013 5.00 0.1009 4.954 1.027 1.022 4.50 0.0908 5.044 1.048 1.026 4.00 0.0807 5.120 1.052 1.052 3.50 0.0706 5.056 1.045 1.006 3.00 0.0605 5.133 1.051 1.020