AGARD Working Group 21 data base - October 1997 CASE PCH02 Smooth Wall Pipe Reynolds Stresses Re =175,000 (nominal) Ut =1.0473 m/s x/D =398.5 D =99.1 mm nominal wire length =0.8 mm hot-wire results corrected for density decrease at the measuring station owing to the pipe pressure drop. data in following order y(mm), y/(D/2), u'2/Ut2, v'2/Ut2, -u'v'/Ut2, 49.55 1.000 0.8623 0.4662 0.0356 45.00 0.9082 0.9969 0.4838 0.1229 40.00 0.8073 1.221 0.5312 0.2231 35.00 0.7064 1.558 0.5922 0.3224 30.00 0.6054 1.942 0.6740 0.4205 25.00 0.5045 2.389 0.7487 0.5222 20.00 0.4036 2.945 0.8346 0.6265 15.00 0.3027 3.436 0.9207 0.7183 12.00 0.2422 3.768 0.9197 0.7502 10.00 0.2018 4.097 0.9462 0.8115 7.00 0.1413 4.549 0.9381 0.8433 6.00 0.1211 4.577 0.9471 0.8430 5.00 0.1009 4.752 0.9553 0.8366 4.50 0.0908 4.786 0.9453 0.8381 4.00 0.0807 4.819 0.9417 0.8335 3.50 0.0706 4.951 0.9453 0.8524 3.00 0.0605 4.874 0.9608 0.8231